National Grid Predicts Underground Cable Performance with Simulation
David Scott, UK National Grid, United Kingdom
U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.
Suggested Stories
The Burning Need for Modeling
Riello Burners manufactures high-efficiency low maintenance burners for use in residential and commercial heating ...
Meeting Quality Standards in Oil and Gas Extraction with Ultrasonic Transducers
Baker Hughes saves 30% on prototyping costs by using 3D ultrasonic simulations to optimize transducers used for ...
How Reclosers Ensure a Steady Supply of Power: It’s All in the Magnet
When a tree branch touches overhead cables and causes a momentary short circuit, your lights may flicker. A device ...
Optimizing a GIS for High-Voltage Distribution with Multiphysics Simulation
To speed up the development process for a gas-insulated, metal-enclosed switchgear (GIS), while significantly reducing ...
