SIMULATION SUCCESS STORIES

National Grid Predicts Underground Cable Performance with Simulation

Energy

David Scott, UK National Grid, United Kingdom

U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.

  •  /
1
Loading PDF...

Suggested Stories

The Burning Need for Modeling

The Burning Need for Modeling

Riello Burners manufactures high-efficiency low maintenance burners for use in residential and commercial heating ...

Meeting Quality Standards in Oil and Gas Extraction with Ultrasonic ...

Meeting Quality Standards in Oil and Gas Extraction with Ultrasonic Transducers

Baker Hughes saves 30% on prototyping costs by using 3D ultrasonic simulations to optimize transducers used for ...

How Reclosers Ensure a Steady Supply of Power: It’s All in the Magnet

How Reclosers Ensure a Steady Supply of Power: It’s All in the Magnet

When a tree branch touches overhead cables and causes a momentary short circuit, your lights may flicker. A device ...

Optimizing a GIS for High-Voltage Distribution with Multiphysics Simulation

Optimizing a GIS for High-Voltage Distribution with Multiphysics Simulation

To speed up the development process for a gas-insulated, metal-enclosed switchgear (GIS), while significantly reducing ...