SIMULATION SUCCESS STORIES

National Grid Predicts Underground Cable Performance with Simulation

Energy

David Scott, UK National Grid, United Kingdom

U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.

  •  /
1
Loading PDF...

Suggested Stories

Keynote: Modeling RF Heating of Hydrogen Plasmas for Nuclear Fusion

Keynote: Modeling RF Heating of Hydrogen Plasmas for Nuclear Fusion

In nuclear fusion, the tokamak is the leading candidate for becoming a hydrogen fusion reactor, where the operating ...

Designing Next-Generation CO2 Removal Technology for Better Life in Space

Designing Next-Generation CO2 Removal Technology for Better Life in Space

NASA combines thermal modeling and experimental testing to find the best compressor design for the system that keeps ...

Producing Power, Protecting Fish with a Darrieus Water Turbine

Producing Power, Protecting Fish with a Darrieus Water Turbine

Physixfactor used simulation to design a water turbine for use in coastal flood control structures in the Netherlands. ...

Analyzing a Timeless Tradition Found in Ultra-Luxury Watches

Analyzing a Timeless Tradition Found in Ultra-Luxury Watches

Engineers at HEPIA, HES-SO Geneva are fine-tuning luxury-watch minute repeaters with a surrogate-model-led process ...