SIMULATION SUCCESS STORIES

National Grid Predicts Underground Cable Performance with Simulation

Energy

David Scott, UK National Grid, United Kingdom

U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.

  •  /
1
Loading PDF...

Suggested Stories

Improving Overhead Equipment Devices for a New Era of Railway Transportation

Improving Overhead Equipment Devices for a New Era of Railway Transportation

Using structural modeling and optimization, Raychem RPG designed an autotensioning device and modular cantilever for ...

Voxelgrids Pioneers Accessible MRI Technology Through Virtual Analysis

Voxelgrids Pioneers Accessible MRI Technology Through Virtual Analysis

Voxelgrids Innovations developed India's first locally made MRI scanner, which was specifically designed to be more ...

Understanding the Origin of Uncertainty in Thermometer Calibration

Understanding the Origin of Uncertainty in Thermometer Calibration

Thermometers have widespread application and like any measurement device, they must be calibrated. Many do this with ...

Giving Furniture Testing a Leg Up

Giving Furniture Testing a Leg Up

Chairs must meet quality standards, which requires lengthy and costly testing. To reduce the burden on manufacturers, ...