Normalizing time in COMSOL

Please login with a confirmed email address before reporting spam

Hi everybody, I have a probem in data elaboration. I use a time dependent solver and often run simulations that result in having different virtual times. For instance, I can run a parametric sweep changing some parameters and as an outcome, the virtual simulation time can change even in orders of magnitude.

I would like to understand how can I normalize my simulations with time by plotting t/t_max. If I use a nonlocal coupling on time itself, it will result in a vertical line at x=1.

I use both 6.2 and 6.4 versions. Thanks in advance.


Reply

Please read the discussion forum rules before posting.

Please log in to post a reply.

Note that while COMSOL employees may participate in the discussion forum, COMSOL® software users who are on-subscription should submit their questions via the Support Center for a more comprehensive response from the Technical Support team.