Discussion Closed This discussion was created more than 6 months ago and has been closed. To start a new discussion with a link back to this one, click here.
Time Domain: Results mismatch when adding additional range
Posted 27 mag 2025, 08:51 GMT-4 Mesh, Results & Visualization 3 Replies
Please login with a confirmed email address before reporting spam
Dear Network,
I have a simple time transient thermal analysis (only heat conduction) that runs well. However when adding an additional range I observe that the results before that range (temporarily wise) are changing what is very strange.
In a nutshell : I have results A untill 10ms achieved using rangeA
I run a new simulation with an additional range called rangeB.
So my full simulation time step for that new simulation is rangeA and rangeB like rangeA = 0,0,1,0,001 and then rangeB = 0,001, 1, 10 (this is an example not real values)
Values (especially peak values) with the new simulation are strongly different compared to the initial values from the first simulation. I tried user controlled mesh and a lot of things but nothing change. Do you have any advice ?
Maybe the fact that resolution in rangeA is quite different than resolution=timestep in rangeB ?
Many thanks
Guillaume
